Concept image of hands installing a server in a rack with an orange cable

Data center installation & moves

Get qualified project support for a physical infrastructure change with a work plan and a documented result.

Based in Frankfurt. Projects can be scoped across Germany; remote or on-site delivery depends on the mandate.

Request a video call

The task

A move or installation needs on-site coordination, inventory accuracy and cutover checks. Remote advice alone cannot place equipment or verify cabling.

What Gateflow delivers

  • A site-specific task list, access plan and change window.
  • Agreed installation, recabling, inventory or move work.
  • Cutover checks, exceptions and a handover record.

Delivery and acceptance

The exact people, travel, access requirements and dates are confirmed for each site. The mandate is scoped by day, week or project phase, not sold as generic remote hands.

Where this fits

For data center operators, integrators or companies with a defined infrastructure project in Frankfurt or another agreed location.

What Gateflow needs to begin

The buyer supplies the site, access rules, equipment inventory, rack and cable plan, change window and any vendor requirements. Gateflow agrees which work needs a specialist trade or product certification before assigning people.

How Gateflow checks the result

Checks follow the agreed inventory and cutover plan: equipment location, labels, connections, power-up sequence and named service tests. Exceptions are recorded before the site is handed back.

What the customer receives at handover

The buyer receives updated inventory, test results, deviations and a contact for follow-up within the agreed project scope.